
Nissan · hatch · 2026– · Mk3
Nissan Leaf Engage
The new Leaf. Full grant, serious range.
- After grant1 host
- £28,499
- WLTP1 host
- 375 mi
- MotorwayEstimate
- 263 mi
- Peak DCBlank
- 150 kW
Band 1 · £3,750 off
Official combined
WLTP × 0.70
800 V pack
This model’s variants
01In a UK bay
UK parking bay · 4.8 m × 2.4 m · drawn to scale
02The sheet
Money
| RRP | £32,2491 host One source — shown, cannot win a comparison |
|---|---|
| UK grant | Band 1 · £3,750 off2 hosts Two independent sources |
| After grant | £28,499 |
Range & charge
| WLTP combined | 375 mi1 host One source — shown, cannot win a comparison |
|---|---|
| Motorway estimate | 263 miEstimate WLTP × 0.70. Not a test. |
| Usable battery | 75 kWhBlank No source on this figure |
| Chemistry | NMC |
| Architecture | 800 V |
| Peak DC | 150 kWBlank No source on this figure |
| AC | — |
| 10–80% | — |
Size
| Body | Hatchback |
|---|---|
| Length | 4.40 m |
| Width | 1,810 mmBlank No source on this figure |
| Width with mirrors | — |
| Height | 1,550 mm |
| Wheelbase | — |
| Spare in a 2.4 m bay | 590 mm |
Space
| Boot | 437 LBlank No source on this figure |
|---|---|
| Boot, seats down | — |
| Frunk | — |
| Seats | 5 |
| Towing (braked) | — |
Drive
| Driven wheels | FWD |
|---|---|
| 0–62 mph | — |
| Power | — |
| Vehicle-to-load | — |
| Heat pump | — |
03Company car · 2026-27 · 4%
Same rate on every EV. The difference is the P11D.
20% £21 / month·40% £43 / month
04Same shape, similar money
05Sources
- Nissan UK — Leaf · rrpGbp · read 2026-09-01
- Nissan UK — Leaf · wltpMiles · read 2026-09-01
- GOV.UK — zero emission vehicles eligible for a grant (cars) · grantGbp · read 2026-09-01
- Which? — electric car grant eligible models · grantGbp · read 2026-09-01
- GOV.UK — zero emission vehicles eligible for a grant (cars) · grantBand · read 2026-09-01
- Which? — electric car grant eligible models · grantBand · read 2026-09-01
- Auto Express — every new EV (161 on sale, 28 Aug 2026) · listing · read 2026-09-01
- Motoring Research, 24 Nov 2025: first UK customer deliveries planned for February 2026 · generation · read 2026-10-02
